Abbasi, S. A., M., Riaz, A., Miller, and S., Ahmad. 2015. “On the Performance of Phase I Dispersion Control Charts for Process Monitoring.” Quality and Reliability Engineering International 31 (8): 1705–1716.10.1002/qre.1703
Albers, W., and W. C., Kallenberg. 2004a. “Are Estimated Control Charts in Control?” Statistics 38: 67–79.10.1080/02669760310001619369
Albers, W., and W. C., Kallenberg. 2004b. “Estimation in Shewhart Control Charts: Effects and Corrections.” Metrika 59: 207–234.10.1007/s001840300280
Albers, W., and W. C., Kallenberg. 2005. “New Corrections for Old Control Charts.” Quality Engineering 17: 467–473.10.1081/QEN-200063498
Aly, A. A., N. A., Saleh, M. A., Mahmoud, and W. H., Woodall. 2015. “A Re-Evaluation of the Adaptive Exponentially Weighted Moving Average Control Chart When Parameters Are Estimated.” To Appear in Quality and Reliability Engineering International. 31(8): 1611–1622. doi:10.002/qre.1695.
Bischak, D. P., and D., Trietsch. 2007. “The Rate of False Signals in Control Charts with Estimated Limits.” Journal of Quality Technology 39: 54–65.
Castagliola, P., G., Celano, and G., Chen. 2009. “The Exact Run Length Distribution and Design of the S2 Chart When the in-Control Variance is Estimated.” International Journal of Reliability, Quality, and Safety Engineering 16: 23–38.10.1142/S0218539309003277
Castagliola, P., Y., Zhang, A., Costa, and P., Maravelakis. 2012. “The Variable Sample Size Chart with Estimated Parameters.” Quality and Reliability Engineering International 28: 687–699.10.1002/qre.1261
Chakraborti, S., 2006. “Parameter Estimation and Design Considerations in Prospective Applications of the Estimated–Chart.” Journal of Applied Statistics 33 (4): 439–459.10.1080/02664760500163516
Chen, G., 1997. “The Mean and Standard Deviation of the Run Length Distribution of the Run Length Distribution of Charts when Control Limits are Estimated.” Statistica Sinica 7: 789–798.
Epprecht, E. K., Loureiro, L. D. and Chakraborti, S. 2015. “Effect of the Amount of Phase I Data on the Phase II Performance of S2 and S Control Charts.” Journal of Quality Technology. 47: 139–155.
Faraz, A., W. H., Woodall, and C., Heuchenne. 2015. “Guaranteed Conditional Performance of the S2 Control Chart with Estimated Parameters.” International Journal of Production Research 53 (14): 4405–4413.
Faraz, A., C., Heuchenne, and E. M., Saniga. 2017. “The np Chart with Guaranteed In-control Average Run Lengths.” Quality and Reliability Engineering International 33 (5): 1057–1066.
Gandy, A., and J. T., Kvaløy. 2013. “Guaranteed Conditional Performance of Control Charts via Bootstrap Methods.” Scandinavian Journal of Statistics 40: 647–668.10.1002/sjos.12006
Guo, B., and B. X., Wang. 2017. “The Design of The S2 Control Charts Based on Conditional Performance via Exact Methods.” Quality and Reliability Engineering International. doi:10.1002/qre.2125.
Jones, M. A., and S. H., Steiner. 2012. “Assessing the Effect of Estimation Error on Risk-adjusted CUSUM Chart Performance.” International Journal for Quality in Health Care 24 (2): 176–181.
Jones-Farmer, L. A., W. H., Woodall, S. H., Steiner, and C. W., Champ. 2014. “An Overview of Phase I Analysis for Process Improvement and Monitoring.” Journal of Quality Technology 46: 265–280.
Lee, J., N., Wang, L., Xu, A., Schuh, and W. H., Woodall. 2013. “The Effect of Parameter Estimation on Upper-Sided Bernoulli Cumulative Sum Charts.” Quality and Reliability Engineering International 29: 639–651.10.1002/qre.v29.5
MATLAB and Statistics Toolbox Release. 2010a. The MathWorks Inc. Massachusetts: Natick.
Montgomery, D. C., 2013. Introduction to Statistical Quality Control. 7th ed. Hoboken, NJ: Wiley.
Psarakis, S., A. K., Vyniou, and P., Castagliola. 2014. “Some Recent Developments on the Effects of Parameter Estimation on Control Charts.” Quality and Reliability Engineering International 30: 1113–1129.10.1002/qre.v30.8
Quesenberry, C. P., 1993. “The Effect of Sample Size on Estimated Limits for and X Control Charts.” Journal of Quality Technology 25: 237–247.
Saleh, N. A., M. A., Mahmoud, M. J., Keefe, and W. H., Woodall. 2015a. “The Difficulty in Designing Shewhart X and control charts with estimated parameters.” Journal of Quality Technology 47 (2): 127–138.
Saleh, N. A., M. A., Mahmoud, L. A., Jones-Farmer, and W. H., Woodall. 2015. “Another Look at the EWMA Control Chart with Estimated Parameters (2015b).” Journal of Quality Technology 47 (4): p363–382.
Schoonhoven, M., M., Riaz, and R. J. M. M., Does. 2011. “Design and Analysis of Control Charts for Standard Deviation with Estimated Parameters.” Journal of Quality Technology 43 (4): 307–333.
Testik, M. C., 2007. “Conditional and Marginal Performance of the Poisson CUSUM Control Chart with Parameter Estimation.” International Journal of Production Research 45: 5621–5638.10.1080/00207540701325462
Vardeman, S. B., 1999. “A Brief Tutorial on the Estimation of the Process Standard Deviation.” IIE Transactions 31 (6): 503–507.
Zhang, M., Y., Peng, A., Schuh, F. M., Megahed, and W. H., Woodall. 2013. “Geometric Charts with Estimated Control Limits.” Quality and Reliability Engineering International 29: 209–223.10.1002/qre.1304
Zhang, M., F. M., Megahed, and W. H., Woodall. 2014. “Exponential CUSUM Charts with Estimated Control Limits.” Quality and Reliability Engineering International 30: 275–286.10.1002/qre.v30.2
Zhao, M. J., and A. R., Driscoll. 2016. “The C-Chart with Bootstrap Adjusted Control Limits to Improve Conditional Performance.” Quality and Reliability Engineering International 32 (8): 2871–2881.10.1002/qre.1971