Scientific conference in universities or research centers (Scientific conferences in universities or research centers)
Computational performance of risk-based inspection methodologies for offshore wind support structures
Morato Dominguez, Pablo Gabriel; Marquez, Lucas; Nielsen, Jannie S. et al.
2019
 

Files


Full Text
01_WESC_pptv1.pdf
Publisher postprint (1.16 MB)
Oral presentation
Download

All documents in ORBi are protected by a user license.

Send to



Details



Keywords :
Offshore wind turbines; Optimal decision making; Inspection and Maintenance Planning
Abstract :
[en] Offshore wind turbines are dynamically responding structures reaching around 70 million of stress cycles per year due to the combined action of waves and wind loading. Therefore, the assessment of fatigue deterioration becomes crucial. Besides, fatigue assessment is characterized by large uncertainties associated with both fatigue loads and strength. Inspections can be undertaken to detect potential cracks and therefore improve our belief about the condition of the structure. However, offshore wind inspections are costly and complex operations, involving the deployment of ROVs or divers for the case of underwater components. Risk-based inspection aims to identify the optimal maintenance policy by balancing the risk of structural failure against maintenance efforts (inspections and repairs). Introduction of a risk-based inspection plan can lead to reductions in the expected life-cycle costs as already demonstrated in the Oil & Gas sector. Inspection planning is a complex sequential decision problem where the decision about whether to go or not for an inspection must consider the outcomes from the previous inspections. In theory, it is possible to find the optimal policy by solving a pre-posterior decision analysis. Nevertheless, for the real case of an offshore wind structure standing a lifetime of 20 years, it is not possible to solve a decision tree which is exponentially growing over time and it becomes computationally intractable. Due to the computational limitations, assumptions are generally introduced within the risk-based analysis leading to approximate optimal policies. Traditional risk-based inspection techniques encompass FORM/SORM or Monte Carlo simulations to estimate and update the probability of failure as well as the inclusion of heuristic decision rules to solve the decision problem. However, novel methods and algorithms have been proposed recently to improve the computational efficiency of the risk-based analyses such as Dynamic Bayesian Networks (DBNs) or Partially Observable Markov Decision Processes (POMDPs). The aim of this work is to compare the existing risk-based inspection planning methodologies applicable to offshore wind structures. The computational performance and life-cycle expected costs corresponding to the different methodologies are explored. Additionally, the challenges which risk-based inspection planning is facing in the present are presented and potential solutions are suggested, for instance, on how to incorporate the correlation between structural components or “system-effects” into the risk-based analysis. In order to explore the main aspects involved during the application of the existing risk-based methodologies, the following step are pursued: 1) identification of the most relevant random variables within the deterioration models, 2) calibration of SN/Miner’s fatigue model to a fracture mechanics model, 3) comparison of the methods available for updating the failure probability when information from inspections is available and 4) comparison of the methods available to solve the pre-posterior decision problem corresponding to inspection planning. The optimal inspection plan for an offshore wind tubular joint is then identified by employing the different risk-based methodologies. Thereby, the methodologies are reviewed in terms of: 1) computational time to set up the model, 2) computation time required by the simulation and 3) obtained life-cycle expected costs. The results highlight the computational advantages of modern methods such as DBNs or POMDP which facilitate the identification of more optimal inspection policies.
Disciplines :
Civil engineering
Author, co-author :
Morato Dominguez, Pablo Gabriel ;  Université de Liège - ULiège > Département ArGEnCo > ANAST (Systèmes de transport et constructions navales)
Marquez, Lucas  ;  Université de Liège - ULiège > Département ArGEnCo > Constructions hydrauliques et navales
Nielsen, Jannie S.;  Aalborg University > Department of Civil Engineering
Rigo, Philippe  ;  Université de Liège - ULiège > Département ArGEnCo > Constructions hydrauliques et navales
Language :
English
Title :
Computational performance of risk-based inspection methodologies for offshore wind support structures
Publication date :
June 2019
Event name :
Wind Energy Science Conference 2019
Event organizer :
European Academy of Wind Energy
Event place :
Cork, Ireland
Event date :
17-06-2019 to 20-06-2019
Audience :
International
Available on ORBi :
since 31 May 2020

Statistics


Number of views
100 (16 by ULiège)
Number of downloads
23 (5 by ULiège)

Bibliography


Similar publications



Contact ORBi