Unpublished conference/Abstract (Scientific congresses and symposiums)
Risk based inspection and maintenance planning of miter gates
Dang Van Thuong; Morato Dominguez, Pablo Gabriel; Mai, Anh Quang et al.
2019Smart Rivers 2019 Conference
 

Files


Full Text
Smart Rivers 2019 Conference_Thuong_Abstract.docx
Author preprint (16.3 kB)
Download

All documents in ORBi are protected by a user license.

Send to



Details



Keywords :
Fatigue; Inspection; Miter gate; Dynamic Bayesian network; Cost
Abstract :
[en] Navigation locks play a significant role in inland waterway infrastructures. They allow vessels to transfer from one water level to another. Because of its low cost, high transport capacity, fuel efficiency and environmental friendliness, it is expected that inland navigation transportation will grow and that locks will become larger and of more importance in the future in countries like Vietnam. Miter gates are widely used in navigation locks thanks to its economical and aesthetic aspects. Due to variations of water levels during operation, miter gates are subjected to fatigue damage caused by cyclic loading. The nature of fatigue damage is complicated because fatigue cracks can develop from various unexpected initial defects coming from the manufacturing process. Inspection and repair of developed cracks are costly because the gate needs to be put out of service. The risk-based approach for inspection and maintenance planning is based on pre-posterior decision analysis concerning the two basic decision rules about inspection and repair. This paper discusses the methods to update the failure probability of welded joints considering crack inspection data by using Dynamic Bayesian Network. This method is useful for effective computation deterioration modeling, and failure probabilities can be updated rapidly. Risk-based inspection planning combines the updated probabilities with specific costs of failure, inspection, repair and annual discounting rate in order to estimate the operation and maintenance costs, which is a substantial part of the total expected costs during the service life. The methodology is then applied to a specific case where the operation, maintenance and failure costs of a miter gate are estimated for two sets of heuristic decision rules with respect to the time of inspection: “inspections performed at regular time intervals” and “inspection performed when a certain annual probability failure threshold is reached”. It is assumed that any crack size which is equal or larger than the detectable size (detected during inspection) is repaired. The result shows that the heuristic method based on an “annual probability failure threshold” leads to a lower operation, maintenance and failure cost for the specific case study.
Disciplines :
Civil engineering
Author, co-author :
Dang Van Thuong  ;  Université de Liège - ULiège > Form. doct. sc. ingé. & techn. (archi., gén. civ. - paysage)
Morato Dominguez, Pablo Gabriel ;  Université de Liège - ULiège > Doct. sc. ingé. & techno. (archi., génie civ. - paysage)
Mai, Anh Quang ;  Université de Liège - ULiège > Département ArGEnCo > Constructions hydrauliques et navales
Rigo, Philippe  ;  Université de Liège - ULiège > Département ArGEnCo > Constructions hydrauliques et navales
Language :
English
Title :
Risk based inspection and maintenance planning of miter gates
Publication date :
30 September 2019
Event name :
Smart Rivers 2019 Conference
Event organizer :
AICPN
Event place :
Lyon, France
Event date :
From 30-09-2019 to 02-10-2019
Audience :
International
Name of the research project :
PROJET 2.18
Funders :
WBI - Wallonie-Bruxelles International [BE]
Available on ORBi :
since 25 June 2019

Statistics


Number of views
102 (16 by ULiège)
Number of downloads
18 (1 by ULiège)

Bibliography


Similar publications