[en] Three proposals have been received by the Waterwegen en Zeekanaal NV . This report reviews these proposals of lock design in the framework of HARELBKE LOCK (Design & Build Procedure)
Research Center/Unit :
ANAST (Construction Navale, Fluviale et Maritime, Analyse des Systèmes de Transport)
Disciplines :
Civil engineering
Author, co-author :
Rigo, Philippe ; Université de Liège - ULiège > Département ArGEnCo > Constructions hydrauliques et navales