[en] As a part of commissioning case study, the cooling
ceiling system of a commercial building in Brussels
is experimentally evaluated by means a functional
test procedure and a detailed thermal model of this
system. This one has to be used on situ, as diagnosis
tool in commissioning process in order to determine
the main parameters of the cooling ceiling systems.
Due to the extended gazing surface of the building,
the problem is the overheated zones submitted to the
expected solar heat gain. The subsystems considered
for commissioning process includes the fenestration,
ventilation and cooling ceiling system. The
interaction and individual operation conditions of
each system are evaluated. A Functional Performance
Testing guide (FPT) for cooling ceiling
commissioning process is proposed.
Disciplines :
Energy
Author, co-author :
Fonseca, N.
Hannay, J.
Andre, Philippe ; Université de Liège - ULiège > Département des sciences et gestion de l'environnement > Surveillance de l'environnement
Language :
English
Title :
Commissioning case study of a cooling ceiling system
Publication date :
August 2009
Event name :
Building Simulation 2009
Event organizer :
International Building Performance Simulation Association
Event place :
Glasgow, United Kingdom
Event date :
du 27 au 30 juillet 2009
Audience :
International
Main work title :
Proceedings Building Simulation 2009: BS'09, Glasgow, August 2009