Article (Scientific journals)
Cyclic scheduling in 3-machine robotic flow shops
Crama, Yves; Van de Klundert, Joris
1999In Journal of Scheduling, 2, p. 35-54
Peer Reviewed verified by ORBi
 

Files


Full Text
RoboticConjecture3machines.pdf
Author preprint (254.48 kB)
Download

All documents in ORBi are protected by a user license.

Send to



Details



Abstract :
[en] We consider a robotic flow shop model in which a single robot is responsible for the transportation of parts between machines. For reasons of simplicity, when the shop is to produce a large number of identical parts, the robot usually performs repeatedly a fixed sequence of activities. This sequence of activities is called a 1-unit cycle if each execution of the sequence results in the production of exactly one part. It has been conjectured that 1-unit cycles yield optimal production rates for 3-machine robotic flow shops. We establish the validity of this conjecture.
Disciplines :
Quantitative methods in economics & management
Production, distribution & supply chain management
Author, co-author :
Crama, Yves  ;  Université de Liège > HEC-Ecole de gestion : UER > Recherche opérationnelle et gestion de la production
Van de Klundert, Joris
Language :
English
Title :
Cyclic scheduling in 3-machine robotic flow shops
Publication date :
1999
Journal title :
Journal of Scheduling
ISSN :
1094-6136
eISSN :
1099-1425
Publisher :
Springer Science & Business Media B.V.
Volume :
2
Pages :
35-54
Peer reviewed :
Peer Reviewed verified by ORBi
Available on ORBi :
since 11 October 2016

Statistics


Number of views
66 (1 by ULiège)
Number of downloads
210 (0 by ULiège)

Scopus citations®
 
46
Scopus citations®
without self-citations
46
OpenCitations
 
48

Bibliography


Similar publications



Contact ORBi