© 2015 IEEE. Personal use of this material is permitted. However, permission to reprint/republish this material for advertising or promotional purposes or for creating new collective works for resale or redistribution to servers or lists, or to reuse any copyrighted component of this work in other works must be obtained from the IEEE.
All documents in ORBi are protected by a user license.
Abstract :
[en] A case study dealing with long-term voltage instability in systems hosting active distribution networks is reported in this paper. It anticipates future situations with high penetration of dispersed generation, where the latter are used to keep distribution voltages within desired limits, in complement to load tap changers. The interactions between transmission and active distribution networks are investigated on a 3108-bus test system. It involves transmission grid, large generators, and forty distribution networks, each with dispersed generation steered by a controller inspired of model predictive control. The reported simulations show the impact of distribution network voltage restoration as well as the benefit of load voltage reduction actuated by the dispersed generators.
Scopus citations®
without self-citations
76