© 2015 IEEE. Personal use of this material is permitted. However, permission to reprint/republish this material for advertising or promotional purposes or for creating new collective works for resale or redistribution to servers or lists, or to reuse any copyrighted component of this work in other works must be obtained from the IEEE.
All documents in ORBi are protected by a user license.
Abstract :
[en] This paper proposes a new tracking state estimator aimed at following some of the dynamics of the network state (bus voltage phasors) by a hybrid processing of SCADA and synchronized phasor measurements. The latter are assumed to be available in limited number. To avoid time skew effects, only the SCADA measurements received since the last execution of the estimator are processed. To ensure observability, estimated SCADA measurements are used as pseudo-measurements. The procedure includes a prediction, an innovation analysis and a correction step. The latter consists of solving a constrained least-squares optimization. The simulation results refer to a test system undergoing large disturbances, evolving to long-term voltage instability or stabilized by emergency control. The proposed method appears to satisfactorily track the overall network evolution, even during those severe conditions.
Scopus citations®
without self-citations
5