Effectiveness; Feasibility; Improvement; Top-down construction; Computer Science (all); Civil and Structural Engineering; Mechanics of Materials; Electrical and Electronic Engineering
Abstract :
[en] Top-down construction (TDC) method provides a significant saving in the construction time. The building sequence starts with the construction of retaining wall and the underground load bearing elements which carry the future superstructure. This research aims to evaluate the strength and weakness of TDC approach compared to the conventional bottom-up method in Malaysia through different aspects and improvements are proposed at the end of the study. The questionnaire survey is conducted with the targeted parties who are working in the construction industry. 102 respondents have been responded to the survey. Then, a TDC project in the Kuala Lumpur City Center (KLCC) is selected as the case study in this research. Project information and interview sessions are conducted with the person in charge of the project to obtain an in-depth understanding of the constraints of this method. Survey results show that TDC method is safer for deep underground construction and lesser effects to the surrounding buildings in Malaysia. However, training is required for the contractors to increase the project efficiency. Conclusively, some improvements should be adopted when top-down method inevitably becomes a tendency in the construction industry in Malaysia.
Disciplines :
Civil engineering
Author, co-author :
Wong, Jing-Ying; Department of Civil Engineering, University of Nottingham Malaysia Campus, Semenyih, Malaysia
Yip, Chun-Chieh; Department of Civil Engineering, Universiti Tunku Abdul Rahman Sungai Long Campus, Kajang, Malaysia
Mugumya, Kevin Luwemba ; Université de Liège - ULiège > Montefiore Institute of Electrical Engineering and Computer Science ; Department of Civil Engineering, University of Nottingham Malaysia Campus, Semenyih, Malaysia
Tan, Bing-Hong; Department of Civil Engineering, University of Nottingham Malaysia Campus, Semenyih, Malaysia
Anwar, Mohammed Parvez; Department of Civil Engineering, University of Nottingham Malaysia Campus, Semenyih, Malaysia
Language :
English
Title :
Effectiveness of top-down construction method in Malaysia
Publication date :
April 2019
Journal title :
International Journal of Innovative Technology and Exploring Engineering
ISSN :
2278-3075
eISSN :
2278-3075
Publisher :
Blue Eyes Intelligence Engineering and Sciences Publication
Department of Statistics Malaysia. 2019. Retrieved 14 May 2019
Finno, R. J., Atmatzidis, D. K. and Perkins, S. B. 1989. Observed performance of a deep excavation in clay. Journal of Geotechnical Engineering. 115(8): 1045-1064.
Tan, Y. and Wang, D. 2013. Characteristic of a large-scale deep foundation pit excavated by the central-island technique in Shanghai soft clay. I: Bottom-up construction of the central cylindrical shaft. Journal of Geotechnical and Geoenvironmental Engineering. 139(11): 1875-1893.
Basarkar, S. S., Kumar, M., Mohapatro, B. G. and Mutgi, P. R. 2013. Emerging trend in deep basement construction: Top-down technique. IOSR Journal of Mechanical and Civil Engineering. 5: 1-11.
Zinn, W. V. 1968. Economic design of deep basements. Civil Engineering and Public Works Revolution. 68: 275-280.
Paek, J. H. and Ockz, J. H. 1996. Innovative building construction technique: Modified up-down method. Journal of Construction Engineering and Management, 122(2): 141-146.
Yurkevich, P. B. 2013. Development top-down method of underground construction or hi-tech in Russian. World Underground Space. 5: 11-27.
Hwang, R. N. and Moh, Z. C., 2007. Performance of floor slabs in excavations using top-down method of construction and correction of inclinometer readings. Journal of GeoEngineering. 2(3): 111-121.
Marchant, S., Wren, G. and Lamb, R. 1994. Top-down construction and its implications. Proceedings of the Institution of Civil Engineers-Geotechnical Engineering, 107(2), pp. 123-124.
De Wit, A. 1988. Measurement of project success. Project Management Journal. 6(3): 164-170.
Endut, I. R., Akintoye, A. and Kelly, J., 2003. Cost and time overruns of projects in Malaysia. Journal of Construction Research. 4(2): 243-252.
Othman, A. A., Torrance, J. V. and Hamid, M. A., 2006. Factors influencing the construction time of civil engineering projects in Malaysia. Civil Engineering Projects in Malaysia. 13(5): 481-501.
Wright, J. N. 1997. Time and budget: the twin imperatives of a project sponsor. International Journal of Project Management. 15(3): 181-186.
Chan, D. W. and Kumaraswamy, M. M., 1997. A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management. 15(1): 55-63.
Chelsea, G., 2015. Using and Interpreting Cronbach’s Alpha. [Online]. RetrievedL 20 April 2017.
Mohsen T. and Reg. D. 2011. Making Sense of Cronbach's Alpha. International Journal of Medical Education. 2: 53-55.
Choo, W. K. 2010. The construction guideline of using top-down method.
Huang, R., Kang, Z., Tan, Y. and Bin, W. 2016. Covered semi top-down excavation of subway station surrounded by closely spaced buildings in downtown Shanghai: Building response. Journal of Performance of Construction Facilities. 30(6): 1-1.
Tan, Y. and Wang, D. 2013. Characteristic of a large-scale deep foundation pit excavated by the central-island technique in Shanghai soft clay. II: Top-down construction of the peripheral rectangular pit. Journal of Geotechnical and Geoenvironmental Engineering. 139(11): 1894-1910.
Li, M. G., Chen, J. J., Xu, A. J. and Xia, X. H. 2014. Case study of innovative top-down construction method with channel-type excavation. Journal of Construction Engineering Management, 140(5): 1-1.