Letter to the editor (Scientific journals)
The stone which the builders rejected... : Delay of reinforcement and response rate on fixed-interval and related schedules
Wearden, J. H.; Lejeune, Helga
2006In Behavioural Processes, 71 (2-3), p. 77-87
Peer Reviewed verified by ORBi
 

Files


Full Text
1-s2.0-S0376635705002196-main.pdf
Publisher postprint (445.69 kB)
Request a copy

All documents in ORBi are protected by a user license.

Send to



Details



Keywords :
fixed-interval schedules; mixed-fixed-interval schedules; running rates; peak rates; delay of reinforcement; temporal control
Abstract :
[en] The article deals with response rates (mainly running and peak or terminal rates) on simple and on some mixed-FI schedules and explores the idea that these rates are determined by the average delay of reinforcement for responses occurring during the response periods that the schedules generate. The effects of reinforcement delay are assumed to be mediated by a hyperbolic delay of reinforcement gradient. The account predicts that (a) running rates on simple FI schedules should increase with increasing rate of reinforcement, in a manner close to that required by Hermstein's equation, (b) improving temporal control during acquisition should be associated with increasing running rates, (c) two-valued mixed-FI schedules with equiprobable components should produce complex results, with peak rates sometimes being higher on the longer component schedule, and (d) that effects of reinforcement probability on mixed-FI should affect the response rate at the time of the shorter component only. All these predictions were confirmed by data, although effects in some experiments remain outside the scope of the model. In general, delay of reinforcement as a determinant of response rate on FI and related schedules (rather than temporal control on such schedules) seems a useful starting point for a more thorough analysis of some neglected questions about performance on FI and related schedules. (c) 2005 Elsevier B.V. All rights reserved.
Disciplines :
Neurosciences & behavior
Zoology
Animal psychology, ethology & psychobiology
Author, co-author :
Wearden, J. H.
Lejeune, Helga ;  Université de Liège - ULiège > Unité de psychobiologie des processus temporels
Language :
English
Title :
The stone which the builders rejected... : Delay of reinforcement and response rate on fixed-interval and related schedules
Publication date :
28 February 2006
Journal title :
Behavioural Processes
ISSN :
0376-6357
Publisher :
Elsevier, Netherlands
Volume :
71
Issue :
2-3
Pages :
77-87
Peer reviewed :
Peer Reviewed verified by ORBi
Available on ORBi :
since 23 November 2021

Statistics


Number of views
60 (5 by ULiège)
Number of downloads
2 (2 by ULiège)

Scopus citations®
 
9
Scopus citations®
without self-citations
7
OpenCitations
 
5

Bibliography


Similar publications



Contact ORBi