[en] This paper proves the practicality of an iterative algorithm for solving realistic large-scale SCOPF problems. This algorithm is based on the combination of a contingency filtering scheme, used to identify the binding contingencies at the optimum, and a network compression method, used to reduce the complexity of the post-contingency models included in the SCOPF formulation. We show that by combining these two complementary ideas, it is possible to solve in a reasonable time SCOPF problems on large power system models with a large number of contingencies. Unlike most results reported for large-scale SCOPF problems, our algorithm uses a non-linear AC network model in both pre-contingency and post-contingency states, optimizes both active/reactive powers flows jointly, and treats the discrete variables. The proposed algorithm is implemented with state-of-the-art solvers and applied to two systems: a national grid with 2563 buses and 1297 contingencies, and a model of the European transmission network with 9241 buses and 12000 contingencies.
O. Alsac and B. Stott, "Optimal load flow with steady-state security,"IEEE Trans. Power App. Syst., vol. PAS-93, no. 3, pp. 745-751, 1974.
A. J. Monticelli, M. V. P. Pereira, and S. Granville, "Security-constrainedoptimal power flow with post-contingency correctiverescheduling," IEEE Trans. Power Syst., vol. 2, no. 1, pp. 175-182,Feb. 1987. (Pubitemid 17549338)
F. Capitanescu, J. L. M. Ramos, P. Panciatici,D.Kirschen, A. M. Marcolini,L. Platbrood, and L. Wehenkel, "State-of-the-art, challenges,and future trends in security-constrained optimal power flow," Elect.Power Syst. Res., vol. 81, no. 8, pp. 1731-1741, 2011.
B. Stott and O. Alsac, "Optimal power flow-basic requirements forreal-life problems and their solutions (White Paper)," in Proc. SEPOPEXII Symp., Rio de Janeiro, Brazil, May 2012.
T. J. Bertram, K. D. Demaree, and L. C. Dangelmaier, "An integratedpackage for real-time security enhancement," IEEE Trans. Power Syst.,vol. 5, no. 2, pp. 592-600, May 1990.
O. Alsac, J. Bright, M. Prais, and B. Stott, "Further developments inLP-based optimal power flow," IEEE Trans. Power Syst, vol. 5, no. 3,pp. 697-711, Aug. 1990. (Pubitemid 20739206)
T. J.Overbye, X. Cheng, andY. Sun, "A comparison of theACandDCpower flow models for LMP calculations," in Proc. 37th Annu. HICSSConf., Big Island, HI, USA, 2004.
F. Capitanescu, M. Glavic, D. Ernst, and L. Wehenkel, "Contingencyfiltering techniques for preventive security-constrained optimal powerflow," IEEE Trans. Power Syst., vol. 22, no. 4, pp. 1690-1697, Nov.2007. (Pubitemid 350141968)
F. Capitanescu and L. Wehenkel, "A new iterative approach to thecorrective security-constrained optimal power flow problem," IEEETrans. Power Syst., vol. 23, no. 4, pp. 1533-1541, Nov. 2008.
K. Karoui, H. Crisciu, A. Szekut, and M. Stubbe, "Large scale securityconstrained optimal power flow," in Proc. 16th Power Syst. ComputationConf., Glasgow, U.K., Jul. 14-18, 2008.
P. Dimo, Nodal Analysis of Power Systems. Tunbridge Wells, Kent,U.K.: Abacus Press, 1975.
R. H. Byrd, M. E. Hribar, and J. Nocedal, "An interior point algorithmfor large-scale non-linear programming," SIAM J. Optimiz., vol. 9, pp.877-900, Apr. 1999. (Pubitemid 129489310)
K. Karoui, L. Platbrood, H. Crisciu, and R. Waltz, "New large-scalesecurity constrained optimal power flow program using a new interiorpoint algorithm," in Proc. 5th Int. Conf. Eur. Electricity Market, 2008.
L. Lasdon, Optimization Theory for Large Systems. London, U.K.:Macmillan, 1970.
M. Stubbe, K. Karoui, T. V. Cutsem, and L.Wehenkel, "Le projet PEGASE,"Revue E tijdschrift, vol. 4, pp. 37-41, Dec. 2008.
European FP7 project PEGASE. [Online]. Available: http://www.fp7-pegase. com/.
L. Platbrood, H. Crisciu, F. Capitanescu, and L. Wehenkel, "Solvingvery large scale SCOPF problems by combining iterative algorithmsand network compression," in Proc. PSCC Conf., Sweden, Aug. 2011.
P. J. Macfie, G. A. Taylor, M. R. Irving, P. Hurlock, and W. Hai-Bin, "Proposed shunt rounding technique for large-scale security constrainedloss minimization," IEEE Trans. Power Syst., vol. 25, no. 3,pp. 1478-1485, Aug. 2010.
A. M. Marcolini, F. Capitanescu, J. L. M. Ramos, and L. Wehenkel,"Exploiting the use of DC SCOPF approximation to improve iterativeAC SCOPF algorithms," IEEE Trans. Power Syst., vol. 27, no. 3, pp.1459-1466, Aug. 2012.
R. Jabr, N. Martins, B. Pal, and S. Karaki, "Contingency constrainedVAr planning using penalty successive conic programming," IEEETrans. Power Syst., vol. 27, no. 1, pp. 545-553, Feb. 2012.
F. Capitanescu and L. Wehenkel, "Experiments with the interior-pointmethod for solving large scale optimal power flow problems," Elect.Power Syst. Res., vol. 95, no. 2, pp. 276-283, Feb. 2013.
F.-X. Bouchez, B. Haut, L. Platbrood, and K. Karoui, "HPC for powersystems in the framework of the PEGASE project," Proc. IEEE PESGeneral Meeting, USA, Jul. 2012.
L. Platbrood, S. Fliscounakis, F. Capitanescu, P. Panciatici, C. Merckx,and M. Ortega-Vazquez, Deliverable D3.2: Development of PrototypeSoftware for Steady State Optimisation of the ETN PEGASE Project,2011. [Online]. Available: http://www.fp7-pegase.com/.
S. Leclerc (task leader), Deliverable 6.3-Part 2 Demonstration Reportfor Steady State Optimization PEGASE Project, 2012. [Online]. Available:http://www. fp7-pegase.com/.
R. Waltz and T. Platenga, Knitro 6.0 User's Manual, 2009.
F. Villella, S. Leclerc, I. Erlich, and S. Rapoport, "PEGASE pan-Europeantest-beds for testing of algorithms on very large scale powersystems," in Proc. IEEE PES ISGT, Germany, Jul. 2012.
F. Capitanescu and L. Wehenkel, "Sensitivity-based approaches forhandling discrete variables in optimal power flow computations," IEEETrans. Power Syst., vol. 25, no. 4, pp. 1780-1789, Nov. 2010.