No full text
Expert report (Reports)
Advisory Board - new Lock in IJmuiden.
Rigo, Philippe
2011
 

Files


Full Text
No document available.

Send to



Details



Keywords :
LOck; lock design; Sea lock
Abstract :
[en] ‘The Advisory Board is to help the Directorate-General for Public Works and Water Management (RWS) and - via RWS - the contractor to draw up an optimal cost-effective detail for the lock design for the new Big Lock in IJmuiden. The Advisory Board is requested to assess the lock component variants proposed by the consultant engineers and to propose other variants for improving the design. The Advisory Board is requested to point out technical and nautical risks and to propose how risks can be quantified and managed. The Advisory Board is requested to describe the process used to select the preferred variant.’
Disciplines :
Civil engineering
Author, co-author :
Rigo, Philippe  ;  Université de Liège - ULiège > Département ArGEnCo > Constructions hydrauliques et navales
Language :
English
Title :
Advisory Board - new Lock in IJmuiden.
Publication date :
September 2011
Publisher :
Rijkwaterstaat, Amsterdam, Netherlands
Number of pages :
6 reports of 10-20 pages
Commissioned by :
Rijkwaterstaat - Port of Amsterdam, Sea Access IJmond
Name of the research project :
lock design for the new Lock in IJmuiden.
Funders :
RIJKWATERSTAAT, Port of AMsterdam
Available on ORBi :
since 20 April 2012

Statistics


Number of views
142 (0 by ULiège)
Number of downloads
0 (0 by ULiège)

Bibliography


Similar publications



Contact ORBi